This process tests the cellmon network is a complete circuit for a decentralised WatchMon.
Only used for decentralised systems.
You may be required to perform a Network Test if the box still missing the “Tick Box” after performing the Wizard Setup.
On Setup Check List check the No.5 - Network Test. This will open up the network tester screen.
To begin the network test, click Start.
This will verify the daisy-chain continuity making sure the message sent from the WatchMon is passing through all CellMons and returning to the WatchMon without interruptions. The LED lights on the CellMons will all light ON and OFF slowly during this test.
A green or red message should appear on the screen as per the examples below:
Green: Network Test Success.
You must manually click “Stop” to stop this test.
Please proceed to the next step, Bypass Test.
Red: ERROR
You will need to check the blue/yellow wires connecting all the CellMons. Check the CMU cable and connector number.
You must manually click “Stop” to stop this test.
Run the test again.